Key |
Description |
Beginning |
End |
End user |
|
EPC |
E725 – Damping and drainage of cooling-water systems in the Unit 1 and Unit 2 pumping station |
2021 |
2023 |
ČEZ, a.s., JE Temelín |
|
EPC |
Operational safety system (non essential) - F114 - New butterfly valves, electric and hydraulic actuators of the outer cooling circuit |
2023 |
ongoing |
ČEZ, a.s., JE Temelín |
|
EPC |
Repair of 2 pcs intlet devices of TG2 VE Trenčín |
2023 |
2025 |
Slovenské elektrárne, a.s. |
|
EPC |
Production and delivery of 2 pcs of outlet boards for TG1 Nové Mesto nad Váhom |
2019 |
2019 |
Slovenské elektrárne, a.s. |
|
EOC |
Repair of 2 pcs intlet devices of TG2 VE Trenčín |
2019 |
2020 |
Slovenské elektrárne, a.s. |
|
EOC |
Overhaul of 2 pcs inlet equipment of TG 2 Nosice |
2015 |
2016 |
Slovenské elektrárne, a.s. |
|
EP |
Production and delivery of 2 pcs of outlet boards Kostolná, Dubnica |
2015 |
2015 |
Slovenské elektrárne, a.s. |
|
EP |
Production and delivery of 4 pcs intlet boards, Horná Streda |
2016 |
2017 |
Slovenské elektrárne, a.s. |
|
EPC |
Repair of hydraulic system and control - Kosihy, Šahy, Sokolec |
2013 |
2013 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |
|
EOC |
Repair of 2 pcs hydraulic cylinders for canal locks level Gabčíkovo |
2014 |
2014 |
Vodohospodárska výstavba, š.p. |
|
PC |
Production and delivery of 2 pcs outlet stop boards for TG1 VE Horná Streda and Kostolná |
2014 |
2015 |
Slovenské elektrárne, a.s. |
|
EP |
Repair of 2pcs canal cooling water feeders from VE Lipovec outlet – BO TG2“ |
2014 |
2015 |
Slovenské elektrárne, a.s. |
|
PC |
Slepčany, VN Slepčany – repair of shutters |
2014 |
2015 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |
|
E |
Hydraulic control of idle gate Sučany |
2014 |
2016 |
Slovenské elektrárne, a.s. |
|
EPC |
SVD G N Gabčíkovo- canal locks -relocation of hydraulic pipelines in turbine hall |
2014 |
2015 |
Vodohospodárska výstavba, š.p. |
|
OC |
Overhaul of flap valves TG1 and TG2 PVE Ružín including exchage of cooling water pipeline DN400 in flaps machine room |
2011 |
2012 |
Slovenské elektrárne, a.s. |
|
EOC |
Overhaul of hydraulic drives of control valves for inlets and outlets in canal locks of level Gabčíkovo |
2011 |
2011 |
Vodohospodárska výstavba, š.p. |
|
EP |
Reconstruction of canal locks control and construction of mechanical room of hydraulic stations in canal locks SVD G-N, level Gabčíkovo |
2011 |
2015 |
Vodohospodárska výstavba, š.p. |
|
EPC |
Production of hydraulic drives for central hurdle control of level Čuňovo |
2011 |
2011 |
Vodohospodárska výstavba, š.p. |
|
EPC |
Production and installation of 4 pieces double-shell tanks for hydraulic oil storage, á 5 m3, including electrical equipment and identification of leakages - for hydro-technical facility Gabčíkovo - inlet/ outlet |
2011 |
2014 |
Vodohospodárska výstavba, š.p. |
|
EOC |
Overhaul of 2 pcs of inlet equipment TG 3 Nosice |
2012 |
2013 |
Slovenské elektrárne, a.s. |
|
PC |
Repair of shutters VS Veľké Kozmálovce |
2012 |
2013 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |
|
EOC |
Overhaul of 2 pcs inlet equipment of TG 3 Nosice / Repair of 2 pcs of piston rods of servomotors of fast closing valves in TG 3 Nosice |
2012 |
2013 |
Slovenské elektrárne, a.s. |
|
E |
Study - Hydraulic control of idle penstock in Krpeľany, Sučany, Lipovec |
2012 |
2012 |
Slovenské elektrárne, a.s. |
|
PC |
Repair of distribution pipeline shutters in VS Nováky (ŠŠ2) |
2013 |
2013 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |
|
PC |
Repair of distribution pipeline shutters in VS Nováky (ŠŠ4) |
2013 |
2013 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |
|
EP |
Production and delivery of 2 pcs of outlet boards Kostolná, Dubnica |
2013 |
2013 |
Slovenské elektrárne, a.s. |
|
PC |
Automatisation of distribution pipeline shutters on VS Nováky (N. Rudno) |
2013 |
2013 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |
|
OC |
Hurdle Bošany MVE repair of turbine |
2013 |
2013 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |
|
EPC |
VS Veľké Kozmálovce repair of heating I.hurdle field |
2013 |
2014 |
SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p. |