| Key | EPC |
|---|---|
| Description | 7742 - New cooling water isolation gates and valves with actuatorsas as part of winter protection procedure including complete civil, mechanical, electrical and I&C auxiliaries |
| Beginning | 2020 |
| End | 2023 |
| End user | ČEZ, a.s., JE Temelín |
| Key | EPC |
|---|---|
| Description | M29C – Firefighting system consisting of piping and electrical installation works for FM200 System |
| Beginning | 2020 |
| End | 2021 |
| End user | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| Key | PC |
|---|---|
| Description | Resolution of Findings on Diesel generator station (DGS) Unit 3 during Commissioning/Technical operation |
| Beginning | 2020 |
| End | 2020 |
| End user | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| Key | EC |
|---|---|
| Description | Completion of Emergency Diesel Generator System Unit 3 and Common as an integrator in the Mochovce 34 Nuclear Power Plant |
| Beginning | 2020 |
| End | 2022 |
| End user | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| Key | EPC |
|---|---|
| Description | Modification of feed water flow nozzles behind the high-pressure heater |
| Beginning | 2020 |
| End | 2021 |
| End user | Slovenské elektrárne, a.s., JE EMO 1, 2 |
| Key | EP |
|---|---|
| Description | M67A - SS gate valves |
| Beginning | 2020 |
| End | 2020 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | EP |
|---|---|
| Description | Bellows-sealed vent and drain valves of the primary circuit |
| Beginning | 2020 |
| End | 2020 |
| End user | PPA ENERGO, s.r.o. |
| Key | EP |
|---|---|
| Description | Drum for Project 19PBCH |
| Beginning | 2020 |
| End | 2021 |
| End user | Borsodchem Zrt. |
| Key | PC |
|---|---|
| Description | Restoration of adsorption equipment |
| Beginning | 2020 |
| End | 2020 |
| End user | SPOLANA s.r.o. |
| Key | EP |
|---|---|
| Description | Reactor_R101 |
| Beginning | 2020 |
| End | 2020 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | W260 exchanger tube bundle repair |
| Beginning | 2020 |
| End | 2020 |
| End user | DEZA, a.s. |
| Key | E |
|---|---|
| Description | OSBL LPR flows external distribution |
| Beginning | 2020 |
| End | 2020 |
| End user | SLOVNAFT, a.s. |
| Key | EP |
|---|---|
| Description | Stainells steel tank KTP |
| Beginning | 2020 |
| End | 2021 |
| End user | KTP Group, s.r.o. |
| Key | EP |
|---|---|
| Description | Quick acting valves VELAN pneumatic cylinder sealing sets |
| Beginning | 2021 |
| End | 2021 |
| End user | ČEZ, a.s., JE Temelín |
| Key | EPC |
|---|---|
| Description | Severe accident management - 7296 - Primary circuit depressurisation system |
| Beginning | 2021 |
| End | 2025 |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EPC |
|---|---|
| Description | 7419 – Upgrade of the drain and discharge lines and associated components on the steam generator main collector and discharge collector, including new pipelines, pipeline components, and isolation and control valves |
| Beginning | 2021 |
| End | ongoing |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EPC |
|---|---|
| Description | Long term heat removal - 7442 – Complete design, development, qualification, production and implementation of original system and components design solution fully implemented to primary and secondary island of VVER 1000 |
| Beginning | 2021 |
| End | ongoing |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EPC |
|---|---|
| Description | Long term heat removal - G840 - Complete design, development, qualification, production and implementation of original system and components design solution fully implemented to primary and secondary island of VVER 1000 |
| Beginning | 2022 |
| End | 2024 |
| End user | ČEZ, a.s., JE Temelín |
| Key | EPC |
|---|---|
| Description | LD17007 New gasoline washing technologic unit I. and II. stage |
| Beginning | 2021 |
| End | 2023 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EPC |
|---|---|
| Description | Chemical plant for the production of "Rhamnolipids" |
| Beginning | 2022 |
| End | 2023 |
| End user | Evonik Fermas, s.r.o. |
| Key | EPC |
|---|---|
| Description | Operational safety system - 9543 - 2TJ21S05 - Complete design, development, qualification, production and implementation of own nuclear qualified quick-acting valve |
| Beginning | 2023 |
| End | 2024 |
| End user | ČEZ, a.s., JE Dukovany |
| Key | C |
|---|---|
| Description | R19EJ2X1 |
| Beginning | 2019 |
| End | 2019 |
| End user | SLOVNAFT MONTÁŽE A OPRAVY a.s. |
| Key | EP |
|---|---|
| Description | Purge vessel M-242 |
| Beginning | 2019 |
| End | 2020 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Cooler E102B tube bundle |
| Beginning | 2019 |
| End | 2020 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EPC |
|---|---|
| Description | Restoration of polymerization reactor condensers |
| Beginning | 2019 |
| End | 2020 |
| End user | SPOLANA s.r.o. |
| Key | S |
|---|---|
| Description | Technical, quality support for Mechanical Completion works in Conventional Island Unit 4 |
| Beginning | 2019 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| Key | R |
|---|---|
| Description | Early engineering works |
| Beginning | 2019 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| Key | E |
|---|---|
| Description | Operational safety system - Fast track design & engineering activities - Essential Diesel Generator Station (EDGS) -Unit 4 |
| Beginning | 2019 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| Key | PC |
|---|---|
| Description | Upgrade of HP Air Compressor - piping and installation of solenoid valves |
| Beginning | 2019 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s. JE MO34 |
| Key | A |
|---|---|
| Description | Operational safety system - Elaboration of procedure and providing of cracks assesment - MSIVs |
| Beginning | 2019 |
| End | 2019 |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EPC |
|---|---|
| Description | Design reliability recovery of security systems spraying coolers |
| Beginning | 2019 |
| End | ongoing |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EP |
|---|---|
| Description | Tube bundle for oil heater |
| Beginning | 2019 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s., JE EMO12 |
| Key | E |
|---|---|
| Description | Operational safety system - Supply of the overall Detail Design including 3D model for EDGS U4 |
| Beginning | 2019 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s. JE MO34 |
| Key | EP |
|---|---|
| Description | 8266 -VELAN quick acting main steam isolation valves wedges upgrade -new VELAN wedges |
| Beginning | 2020 |
| End | ongoing |
| End user | ČEZ, a.s., JE Dukovany |
| Key | E |
|---|---|
| Description | As built design |
| Beginning | 2019 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s. JE MO34 |
| Key | A |
|---|---|
| Description | Operational safety system - 7635 -Upgrade of bonnets and bolting of Main steam quick acting isolation valves (MSIVs) |
| Beginning | 2019 |
| End | 2020 |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EPC |
|---|---|
| Description | IPR EBO B19117 New butterfly valves 15.0.104.4 |
| Beginning | 2019 |
| End | 2020 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EPC |
|---|---|
| Description | Steam moisture droplet separators upstream the TG (Skoda-Doosan K220-44) |
| Beginning | 2020 |
| End | 2021 |
| End user | Slovenské elektrárne, a.s., JE EMO12 |
| Key | EPC |
|---|---|
| Description | Electrovalves replacement at the KO15 reactor entry |
| Beginning | 2018 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Tube bundle 2515-RB01 |
| Beginning | 2018 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Tube bundle 3411-E032 |
| Beginning | 2018 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EC |
|---|---|
| Description | New oil tank at blending station |
| Beginning | 2018 |
| End | 2020 |
| End user | SLOVNAFT, a.s. |
| Key | E |
|---|---|
| Description | AAG - New Pipeline to Flare |
| Beginning | 2018 |
| End | 2019 |
| End user | SLOVNAFT, a.s. |
| Key | EP |
|---|---|
| Description | New exchangers E-501A a E-502A |
| Beginning | 2018 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Tube bundle of U-exchanger 1393-E10 |
| Beginning | 2018 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EPC |
|---|---|
| Description | Replacement of the damper at the entrance to R-101 |
| Beginning | 2018 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | New reactor R502A at POX |
| Beginning | 2019 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | PC |
|---|---|
| Description | Oxychlorination reactor R 304 - Production and supply |
| Beginning | 2019 |
| End | ongoing |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EPC |
|---|---|
| Description | LR17026- OHC electric valves |
| Beginning | 2019 |
| End | 2020 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Tube bundle with the tubesheet restoration in E4.2C cooler |
| Beginning | 2019 |
| End | 2020 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Steam separator FA-134 |
| Beginning | 2019 |
| End | 2020 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Technological steam preheater EA-129 |
| Beginning | 2019 |
| End | 2020 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Apparatus to exchanger 4310-E01/E02 |
| Beginning | 2017 |
| End | 2017 |
| End user | Unipetrol RPA pre RAFINÉRIE |
| Key | EPC |
|---|---|
| Description | Air coolers 2513-A02/1,2 a 2514-A02/1,2,3,4,5 production and repair |
| Beginning | 2017 |
| End | 2018 |
| End user | Unipetrol RPA, s.r.o. Litvínov |
| Key | PC |
|---|---|
| Description | H115 conenser bundle renovation |
| Beginning | 2017 |
| End | 2017 |
| End user | SPOLANA a.s. |
| Key | EP |
|---|---|
| Description | TA2018 Apparatuses for 3,4,6,7 units |
| Beginning | 2017 |
| End | 2018 |
| End user | Unipetrol RPA pre RAFINÉRIE |
| Key | EPC |
|---|---|
| Description | New connecting pipeline and technology for spent fuel storage pool filling and reactor shaft filling No.1 |
| Beginning | 2015 |
| End | 2017 |
| End user | Slovenské elektrárne, a.s. JE EBO V2 |
| Key | A |
|---|---|
| Description | Operational safety system - Main Isolation Quick Acting valves (MSIV) - Assessment of service life and functionality of quick acting valves |
| Beginning | 2015 |
| End | 2015 |
| End user | ČEZ, a.s. JE Dukovany |
| Key | EOC |
|---|---|
| Description | Upgrade and safety enhancement of MSIVs DN450 and DN 500, R&D and fabrication of new quick acting actuators |
| Beginning | 2016 |
| End | 2023 |
| End user | ČEZ, a.s. JE Dukovany |
| Key | EPC |
|---|---|
| Description | Severe Accident management - Emergency source of coolant - New connecting pipeline 8JNR10 |
| Beginning | 2016 |
| End | 2019 |
| End user | Slovenské elektrárne, a.s. JE MO34 |
| Key | EPC |
|---|---|
| Description | 6781-New pumps 1-2TB20,40,60D01 |
| Beginning | 2017 |
| End | 2022 |
| End user | ČEZ, a.s. JE Dukovany |
| Key | PC |
|---|---|
| Description | PNR 0116 - Small mechanical projects |
| Beginning | 2017 |
| End | 2018 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EPC |
|---|---|
| Description | Replacement of essential mechanical pipeline components - stage 2 |
| Beginning | 2015 |
| End | 2018 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EPC |
|---|---|
| Description | New boron concentration meters |
| Beginning | 2017 |
| End | 2018 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EPC |
|---|---|
| Description | Modification of coolers of shower systems |
| Beginning | 2017 |
| End | ongoing |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | PC |
|---|---|
| Description | Delivery, replacement and overhaul of gland expansion joints within heat transfer pipeline from NPP Bohunice to district heating of city Hlovohovec |
| Beginning | 2018 |
| End | 2022 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EP |
|---|---|
| Description | New heat exchangers E501B, E502B |
| Beginning | 2017 |
| End | 2019 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | C5 EA711 remnant heater |
| Beginning | 2018 |
| End | 2018 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | Production of 1piece of tube bundle 2511-E03 |
| Beginning | 2018 |
| End | 2018 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EP |
|---|---|
| Description | AVD6 – C3 column replacement |
| Beginning | 2018 |
| End | 2019 |
| End user | SLOVNAFT, a.s. |
| Key | EPC |
|---|---|
| Description | Replacement of exchanger EA - 710 |
| Beginning | 2016 |
| End | 2016 |
| End user | Unipetrol RPA, s.r.o. Litvínov |
| Key | EP |
|---|---|
| Description | Nitrous gas coolers tube bundle E5281 |
| Beginning | 2016 |
| End | 2016 |
| End user | Lovochemie, a.s. Lovosice |
| Key | EP |
|---|---|
| Description | 2411-H02/2,3 Generator HHP-GEN 2 pcs |
| Beginning | 2016 |
| End | 2016 |
| End user | Česká Rafinérska a.s. |
| Key | EP |
|---|---|
| Description | New tube bundle 2320-E20 production |
| Beginning | 2016 |
| End | 2016 |
| End user | Česká Rafinérska a.s. |
| Key | EP |
|---|---|
| Description | New tube bundle 1393-E10 production |
| Beginning | 2016 |
| End | 2016 |
| End user | Česká Rafinérska a.s. |
| Key | EP |
|---|---|
| Description | New tube bundle 1392-E19 production- 2 pieces |
| Beginning | 2016 |
| End | 2016 |
| End user | Česká Rafinérska a.s. |
| Key | EPC |
|---|---|
| Description | Electric valves exchange at the ammonia production plant |
| Beginning | 2016 |
| End | 2017 |
| End user | Unipetrol RPA, s.r.o. Litvínov |
| Key | EPC |
|---|---|
| Description | Valves exchange on S 101-C and MC151 turbo circulators at the ammonia production plant |
| Beginning | 2016 |
| End | 2017 |
| End user | Unipetrol RPA, s.r.o. Litvínov |
| Key | EPC |
|---|---|
| Description | Valves exchange on S 101-A,B turbo circulators at the ammonia production plant |
| Beginning | 2016 |
| End | 2017 |
| End user | Unipetrol RPA, s.r.o. Litvínov |
| Key | EPC |
|---|---|
| Description | E3.4 a exchanger refurbishment |
| Beginning | 2017 |
| End | 2018 |
| End user | SPOLANA a.s. |
| Key | EP |
|---|---|
| Description | Air cooler 2301-W17/1 |
| Beginning | 2017 |
| End | 2017 |
| End user | Unipetrol RPA, s.r.o. Litvínov |
| Key | EP |
|---|---|
| Description | 2421-W01 exchanger tube bundle |
| Beginning | 2017 |
| End | 2017 |
| End user | Unipetrol RPA pre RAFINÉRIE |
| Key | EP |
|---|---|
| Description | 2418-E02 tube bundle |
| Beginning | 2017 |
| End | 2017 |
| End user | Unipetrol RPA pre RAFINÉRIE |
| Key | E |
|---|---|
| Description | Hydraulic control of idle gate Sučany |
| Beginning | 2014 |
| End | 2016 |
| End user | Slovenské elektrárne, a.s. |
| Key | OC |
|---|---|
| Description | Disassembly, assembly, repairs and revisions of valves and MSA compensators |
| Beginning | 2011 |
| End | 2012 |
| End user | _ |
| Key | EP |
|---|---|
| Description | Tube bundle for VJ EJ 2 |
| Beginning | 2007 |
| End | 2007 |
| End user | SLOVNAFT, a.s. |
| Key | EP |
|---|---|
| Description | Tube bundle for VJ reforming 5 |
| Beginning | 2007 |
| End | 2007 |
| End user | SLOVNAFT, a.s. |
| Key | EP |
|---|---|
| Description | Air exchanger from ribbed tubes |
| Beginning | 2008 |
| End | 2009 |
| End user | SLOVNAFT, a.s. |
| Key | EP |
|---|---|
| Description | Process effluent valves / Ethylene furnaces |
| Beginning | 2008 |
| End | 2009 |
| End user | SLOVNAFT, a.s. |
| Key | EP |
|---|---|
| Description | Tube exchanger V551 for VJ CCR5 |
| Beginning | 2008 |
| End | 2008 |
| End user | SLOVNAFT, a.s. |
| Key | EC |
|---|---|
| Description | Reconstruction of ethylene units part PSA - OSBL |
| Beginning | 2013 |
| End | 2015 |
| End user | SLOVNAFT, a.s. |
| Key | EPC |
|---|---|
| Description | Exchange of selected electrical valves in PS 100-ČP-TA 2016 |
| Beginning | 2015 |
| End | 2016 |
| End user | UNIPETROL RPA, s.r.o. |
| Key | EPC |
|---|---|
| Description | Fully automatic mechanical filtration station for cooling circuits of PPC 80 MWe, Levice |
| Beginning | 2006 |
| End | 2007 |
| End user | Slovintegra energy, s.r.o. |
| Key | EPC |
|---|---|
| Description | High-pressure station including accessories, pre-filters and provisionals |
| Beginning | 2006 |
| End | 2007 |
| End user | Slovintegra energy, s.r.o. |
| Key | EPC |
|---|---|
| Description | Performance of complete outsourcing of mechanical maintenance of PPC 80 MWe Levice including design changes management in mechanical part |
| Beginning | 2007 |
| End | 2010 |
| End user | Slovintegra energy, s.r.o. |
| Key | P |
|---|---|
| Description | Boiler closures, boiler 180 t/h |
| Beginning | 2007 |
| End | 2008 |
| End user | Petrobras |
| Key | C |
|---|---|
| Description | Steam-gas equipment/ Boiler |
| Beginning | 2007 |
| End | 2008 |
| End user | Cementáreň Mordovia, RF |
| Key | EP |
|---|---|
| Description | Control/ turbine hall, boiler |
| Beginning | 2008 |
| End | 2009 |
| End user | BELFAST, UK |
| Key | EP |
|---|---|
| Description | High-pressure and low-pressure bypass station including accessories, pre-filters and provisionals |
| Beginning | 2008 |
| End | 2009 |
| End user | ETI ALUMINYUM, Turecko |
| Key | C |
|---|---|
| Description | Extension of cooling system of air condensation in turbine of 20 MWe by a new section for PPC 80 MWe Levice - including installation of compensators DN1200 and DN2100 |
| Beginning | 2008 |
| End | 2008 |
| End user | Slovintegra energy, s.r.o. |
| Key | C |
|---|---|
| Description | Production of interconnecting pipelines |
| Beginning | 2008 |
| End | 2008 |
| End user | IEG Group, SR |
| Key | EP |
|---|---|
| Description | Main boiler shut-off valve / boiler |
| Beginning | 2009 |
| End | 2009 |
| End user | PPC Energy, s.r.o. |
| Key | EP |
|---|---|
| Description | High-pressure bypass station including accessories, pre-filters and provisionals |
| Beginning | 2009 |
| End | 2009 |
| End user | Eren Erenji Elektrik Uretim, Turecko |
| Key | EP |
|---|---|
| Description | Main boiler shut-off valve / boiler |
| Beginning | 2009 |
| End | 2009 |
| End user | PPC Energy, s.r.o. |
| Key | EP |
|---|---|
| Description | Control/ turbine hall, boiler |
| Beginning | 2010 |
| End | 2012 |
| End user | ČEZ, a.s., PPC POČERADY, CZ 880MW |
| Key | PC |
|---|---|
| Description | Mechanical part of SCP 58 MWe, production and installation of air channels of combustion turbine |
| Beginning | 2010 |
| End | 2010 |
| End user | PPC Energy, s.r.o. |
| Key | EP |
|---|---|
| Description | Implementation of mechanical-technological part - combustion turbine and distributions for ŠZ 58 MWe Prostějov |
| Beginning | 2011 |
| End | 2012 |
| End user | Gama Investment, s.r.o. |
| Key | P |
|---|---|
| Description | HRSC boiler |
| Beginning | 2012 |
| End | 2012 |
| End user | Bacau, Rumunsko |
| Key | EP |
|---|---|
| Description | Control, reduction stations / turbine hall, boiler |
| Beginning | 2008 |
| End | 2009 |
| End user | Colbún S.A., Chile |
| Key | EP |
|---|---|
| Description | Control, reduction stations / turbine hall, boiler |
| Beginning | 2008 |
| End | 2009 |
| End user | TIRME |
| Key | EP |
|---|---|
| Description | Reduction stations / turbine hall |
| Beginning | 2008 |
| End | 2009 |
| End user | SE a.s., SR |
| Key | P |
|---|---|
| Description | Boiler shut-off valves, boiler 1215 t/h |
| Beginning | 2008 |
| End | 2008 |
| End user | Endesa, s.a., Čile |
| Key | PC |
|---|---|
| Description | Heat removal in steam 40T/hour from ENO3,4 to ENOA, complex project of RCHS with power steam lines of class 15 |
| Beginning | 2009 |
| End | 2010 |
| End user | Slovenské elektrárne, a.s., ENO |
| Key | P |
|---|---|
| Description | Preheater |
| Beginning | 2009 |
| End | 2009 |
| End user | Slovenské elektrárne, a.s., EVO |
| Key | PC |
|---|---|
| Description | Delivery, installation and tests of components of coaling for 2x25 MW, Lac Thinh, Vietnam |
| Beginning | 2009 |
| End | 2011 |
| End user | BTG Slovensko |
| Key | EP |
|---|---|
| Description | Delivery of flue-gas ducting flap valves |
| Beginning | 2010 |
| End | 2010 |
| End user | Slovenské elektrárne, a.s., ENO |
| Key | EP |
|---|---|
| Description | Control, reduction stations / turbine hall, boiler |
| Beginning | 2012 |
| End | 2012 |
| End user | EKIBASTUZ |
| Key | EP |
|---|---|
| Description | Control, reduction stations / turbine hall, boiler |
| Beginning | 2012 |
| End | 2012 |
| End user | SVIADNOV |
| Key | EP |
|---|---|
| Description | Control, reduction stations / turbine hall, boiler |
| Beginning | 2012 |
| End | 2012 |
| End user | ELEKTRÁRNA DOMORADICE |
| Key | PC |
|---|---|
| Description | Delivery, exchange and repair of plug components of thermal feeder of EBO - Hlohovec |
| Beginning | 2013 |
| End | 2017 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | C |
|---|---|
| Description | Modernisation of condenser ENO B Unit 1 |
| Beginning | 2013 |
| End | 2013 |
| End user | Slovenské elektrárne, a.s., ENO |
| Key | E |
|---|---|
| Description | Supports detail design documentation |
| Beginning | 2011 |
| End | 2013 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | E |
|---|---|
| Description | Proof documentation for systems JEF,KBF, KTA, KBA,QJ |
| Beginning | 2011 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE EMO12 |
| Key | E |
|---|---|
| Description | Pumps and boron meters for radioactive waste treatment |
| Beginning | 2011 |
| End | 2013 |
| End user | Slovenské elektrárne, a.s., JE EMO12 |
| Key | EC |
|---|---|
| Description | Operational safety system - Main steam isolation quick-acting valves (MSIVs) - Edward Valves |
| Beginning | 2012 |
| End | 2013 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EC |
|---|---|
| Description | Replacement of 27 600 pieces of main condenser tubes |
| Beginning | 2012 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EP |
|---|---|
| Description | Oil / water heat exchangers for oil cooling circuit of the EDGS |
| Beginning | 2012 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EC |
|---|---|
| Description | Flow meters for emergency source of coolant |
| Beginning | 2012 |
| End | 2013 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | E |
|---|---|
| Description | Control slide valves A09, A10 type (3 off) |
| Beginning | 2012 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | E |
|---|---|
| Description | Control slide valves A09 type (3 off) |
| Beginning | 2012 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | E |
|---|---|
| Description | Belows valves A11 (4 off) |
| Beginning | 2012 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | E |
|---|---|
| Description | Belows valves A11 (3 off) |
| Beginning | 2012 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | EC |
|---|---|
| Description | Upgrade of the safety valve system PC 50 type of the steam generator (system of safety valves and control cabinets) |
| Beginning | 2013 |
| End | 2017 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EP |
|---|---|
| Description | Manufacture of 1 piece of tubular heat exchanger |
| Beginning | 2013 |
| End | 2013 |
| End user | ČEZ, a.s., JE Temelín |
| Key | EP |
|---|---|
| Description | Check valves for essential water circuit |
| Beginning | 2013 |
| End | 2016 |
| End user | Slovenské elektrárne, a.s., JE EMO12 |
| Key | E |
|---|---|
| Description | Severe Accident management - Depressurisation of primary circuit - Elaboration of proof documentation of strength, seismic resistance and lifetime of pipelines and steel structures |
| Beginning | 2013 |
| End | 2014 |
| End user | Slovenské elektrárne, a.s., JE EMO12 |
| Key | EP |
|---|---|
| Description | Quick-acting hermetic closures for project- Separation of I&C room of 4KLA71 system (14 off) |
| Beginning | 2013 |
| End | 2014 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | E |
|---|---|
| Description | Shutter WAL-A9 DN500 Cl150 for reactor hall HVAC |
| Beginning | 2013 |
| End | 2013 |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EPC |
|---|---|
| Description | Replacement of fittings - cathexis filter bypass |
| Beginning | 2014 |
| End | 2016 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EPC |
|---|---|
| Description | Operational safety system - IPR EBO 10196 – Modification: Upgrade of the hydrogen reduction station, including generational replacement of equipment, in object 644 SE, EBO V-2 |
| Beginning | 2014 |
| End | 2016 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EPC |
|---|---|
| Description | Replacement of heat exchangers 1&2 RY30W01 - SG blowdown/ Turbine condensate |
| Beginning | 2014 |
| End | 2015 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | E |
|---|---|
| Description | Operational safety system – Upgrade of the reactor confinement spray system - Proof documentation of safety related valves (DN100, DN300, DN400 PN40) |
| Beginning | 2014 |
| End | 2014 |
| End user | Metsamor , ARMENIA |
| Key | P |
|---|---|
| Description | Controls |
| Beginning | 2005 |
| End | 2006 |
| End user | Panevezio Energia |
| Key | C |
|---|---|
| Description | Assembly & disassembly of main condenser modules of TG42 and TG32 |
| Beginning | 2007 |
| End | 2007 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EC |
|---|---|
| Description | Replacement of fire-safety closures for JAVYS-A1 |
| Beginning | 2008 |
| End | 2009 |
| End user | JAVYS, a.s. |
| Key | P |
|---|---|
| Description | Fabrication and completion of the TG (Skoda-Doosan K220-44) cooling skid |
| Beginning | 2008 |
| End | 2008 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | OC |
|---|---|
| Description | Emergency flaps of barbotage system |
| Beginning | 2009 |
| End | 2009 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | OC |
|---|---|
| Description | Repairs, maintenance and inspection of turbines and rotating equipment (including TG Skoda Doosan K220-44) |
| Beginning | 2009 |
| End | 2010 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 & JE EMO12 |
| Key | EP |
|---|---|
| Description | Quick-acting valves for essential service water cooling circuits |
| Beginning | 2009 |
| End | 2010 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | EP |
|---|---|
| Description | Severe accidents management -main machinery technological equipment for flooding the reactor shaft performing active task during severe accidents |
| Beginning | 2009 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | C |
|---|---|
| Description | Works on mechanical systems of primary circuit and secondary circuit - maintenance, repairs and inspections of valves including other works executed on mechanical part of safety systems- MSIVs, MSSVs. Volume compensation |
| Beginning | 2009 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 & JE EMO12 |
| Key | C |
|---|---|
| Description | High pressure and low pressure heater, desuperheaters |
| Beginning | 2009 |
| End | 2010 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EP |
|---|---|
| Description | Contaiment boundary isolation valves |
| Beginning | 2010 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | EP |
|---|---|
| Description | Severe Accident management - Main mechanical part of vacuum breaker system, consisting of special closures with 100% tightness (steel/steel) securing integrity of the containment in stand by mode and provide active function of vacuum breaker during severe accident |
| Beginning | 2010 |
| End | 2011 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | EP |
|---|---|
| Description | General overhaul of existing valves and provision of manufacture of new qualified and unqualified actuators including executing of complete new re-qualification safety and seismic requalification of assembled sets (valve + actuator) |
| Beginning | 2010 |
| End | 2014 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | EP |
|---|---|
| Description | Oil and water stainless steel piping pre-fabrication and installation |
| Beginning | 2010 |
| End | 2010 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | EOC |
|---|---|
| Description | General overhaul of gas tight closures, safety class II,III,IV, N and replacement of actuators Inside and Outside containment |
| Beginning | 2010 |
| End | 2011 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | PC |
|---|---|
| Description | New steam reducing station 4,5/0,7MPa (4 off) |
| Beginning | 2011 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE EMO12 |
| Key | EOC |
|---|---|
| Description | Operational safety system - By-pass station to atmosphere (PSA) - 1 lot delivery |
| Beginning | 2011 |
| End | 2012 |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EOC |
|---|---|
| Description | Operational safety system - By-pass station to atmosphere (PSA) - 2 lot |
| Beginning | 2011 |
| End | 2012 |
| End user | ČEZ, a.s., JE Dukovany |
| Key | EP |
|---|---|
| Description | Severe Accident management - Main mechanical part of Primary circuit depressurisation system consisting of closures retaining full boundary of primary circuit in stand-by mode, ready to provide active function of depressurisation during the severe accident |
| Beginning | 2011 |
| End | 2012 |
| End user | Slovenské elektrárne, a.s., JE EBO V2 |
| Key | C |
|---|---|
| Description | Emergency Core Cooling System, DPS 3.14.01 – rooms A001/1, A002/1, A003/1 |
| Beginning | 2011 |
| End | 2014 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | E |
|---|---|
| Description | Piping detail design documentation & spooling |
| Beginning | 2011 |
| End | 2013 |
| End user | Slovenské elektrárne, a.s., JE MO34 |
| Key | Description | Beginning | End | End user |
|---|---|---|---|---|
| EPC | 7742 - New cooling water isolation gates and valves with actuatorsas as part of winter protection procedure including complete civil, mechanical, electrical and I&C auxiliaries | 2020 | 2023 | ČEZ, a.s., JE Temelín |
| EPC | M29C – Firefighting system consisting of piping and electrical installation works for FM200 System | 2020 | 2021 | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| PC | Resolution of Findings on Diesel generator station (DGS) Unit 3 during Commissioning/Technical operation | 2020 | 2020 | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| EC | Completion of Emergency Diesel Generator System Unit 3 and Common as an integrator in the Mochovce 34 Nuclear Power Plant | 2020 | 2022 | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| EPC | Modification of feed water flow nozzles behind the high-pressure heater | 2020 | 2021 | Slovenské elektrárne, a.s., JE EMO 1, 2 |
| EP | M67A - SS gate valves | 2020 | 2020 | Slovenské elektrárne, a.s., JE MO34 |
| EP | Bellows-sealed vent and drain valves of the primary circuit | 2020 | 2020 | PPA ENERGO, s.r.o. |
| EP | Drum for Project 19PBCH | 2020 | 2021 | Borsodchem Zrt. |
| PC | Restoration of adsorption equipment | 2020 | 2020 | SPOLANA s.r.o. |
| EP | Reactor_R101 | 2020 | 2020 | UNIPETROL RPA, s.r.o. |
| EP | W260 exchanger tube bundle repair | 2020 | 2020 | DEZA, a.s. |
| E | OSBL LPR flows external distribution | 2020 | 2020 | SLOVNAFT, a.s. |
| EP | Stainells steel tank KTP | 2020 | 2021 | KTP Group, s.r.o. |
| EP | Quick acting valves VELAN pneumatic cylinder sealing sets | 2021 | 2021 | ČEZ, a.s., JE Temelín |
| EPC | Severe accident management - 7296 - Primary circuit depressurisation system | 2021 | 2025 | ČEZ, a.s., JE Dukovany |
| EPC | 7419 – Upgrade of the drain and discharge lines and associated components on the steam generator main collector and discharge collector, including new pipelines, pipeline components, and isolation and control valves | 2021 | ongoing | ČEZ, a.s., JE Dukovany |
| EPC | Long term heat removal - 7442 – Complete design, development, qualification, production and implementation of original system and components design solution fully implemented to primary and secondary island of VVER 1000 | 2021 | ongoing | ČEZ, a.s., JE Dukovany |
| EPC | Long term heat removal - G840 - Complete design, development, qualification, production and implementation of original system and components design solution fully implemented to primary and secondary island of VVER 1000 | 2022 | 2024 | ČEZ, a.s., JE Temelín |
| EPC | LD17007 New gasoline washing technologic unit I. and II. stage | 2021 | 2023 | UNIPETROL RPA, s.r.o. |
| EPC | Chemical plant for the production of "Rhamnolipids" | 2022 | 2023 | Evonik Fermas, s.r.o. |
| EPC | Operational safety system - 9543 - 2TJ21S05 - Complete design, development, qualification, production and implementation of own nuclear qualified quick-acting valve | 2023 | 2024 | ČEZ, a.s., JE Dukovany |
| C | R19EJ2X1 | 2019 | 2019 | SLOVNAFT MONTÁŽE A OPRAVY a.s. |
| EP | Purge vessel M-242 | 2019 | 2020 | UNIPETROL RPA, s.r.o. |
| EP | Cooler E102B tube bundle | 2019 | 2020 | UNIPETROL RPA, s.r.o. |
| EPC | Restoration of polymerization reactor condensers | 2019 | 2020 | SPOLANA s.r.o. |
| S | Technical, quality support for Mechanical Completion works in Conventional Island Unit 4 | 2019 | 2019 | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| R | Early engineering works | 2019 | 2019 | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| E | Operational safety system - Fast track design & engineering activities - Essential Diesel Generator Station (EDGS) -Unit 4 | 2019 | 2019 | Slovenské elektrárne, a.s., JE EMO 3, 4 |
| PC | Upgrade of HP Air Compressor - piping and installation of solenoid valves | 2019 | 2019 | Slovenské elektrárne, a.s. JE MO34 |
| A | Operational safety system - Elaboration of procedure and providing of cracks assesment - MSIVs | 2019 | 2019 | ČEZ, a.s., JE Dukovany |
| EPC | Design reliability recovery of security systems spraying coolers | 2019 | ongoing | Slovenské elektrárne, a.s., JE EBO V2 |
| EP | Tube bundle for oil heater | 2019 | 2019 | Slovenské elektrárne, a.s., JE EMO12 |
| E | Operational safety system - Supply of the overall Detail Design including 3D model for EDGS U4 | 2019 | 2019 | Slovenské elektrárne, a.s. JE MO34 |
| EP | 8266 -VELAN quick acting main steam isolation valves wedges upgrade -new VELAN wedges | 2020 | ongoing | ČEZ, a.s., JE Dukovany |
| E | As built design | 2019 | 2019 | Slovenské elektrárne, a.s. JE MO34 |
| A | Operational safety system - 7635 -Upgrade of bonnets and bolting of Main steam quick acting isolation valves (MSIVs) | 2019 | 2020 | ČEZ, a.s., JE Dukovany |
| EPC | IPR EBO B19117 New butterfly valves 15.0.104.4 | 2019 | 2020 | Slovenské elektrárne, a.s., JE EBO V2 |
| EPC | Steam moisture droplet separators upstream the TG (Skoda-Doosan K220-44) | 2020 | 2021 | Slovenské elektrárne, a.s., JE EMO12 |
| EPC | Electrovalves replacement at the KO15 reactor entry | 2018 | 2019 | UNIPETROL RPA, s.r.o. |
| EP | Tube bundle 2515-RB01 | 2018 | 2019 | UNIPETROL RPA, s.r.o. |
| EP | Tube bundle 3411-E032 | 2018 | 2019 | UNIPETROL RPA, s.r.o. |
| EC | New oil tank at blending station | 2018 | 2020 | SLOVNAFT, a.s. |
| E | AAG - New Pipeline to Flare | 2018 | 2019 | SLOVNAFT, a.s. |
| EP | New exchangers E-501A a E-502A | 2018 | 2019 | UNIPETROL RPA, s.r.o. |
| EP | Tube bundle of U-exchanger 1393-E10 | 2018 | 2019 | UNIPETROL RPA, s.r.o. |
| EPC | Replacement of the damper at the entrance to R-101 | 2018 | 2019 | UNIPETROL RPA, s.r.o. |
| EP | New reactor R502A at POX | 2019 | 2019 | UNIPETROL RPA, s.r.o. |
| PC | Oxychlorination reactor R 304 - Production and supply | 2019 | ongoing | UNIPETROL RPA, s.r.o. |
| EPC | LR17026- OHC electric valves | 2019 | 2020 | UNIPETROL RPA, s.r.o. |
| EP | Tube bundle with the tubesheet restoration in E4.2C cooler | 2019 | 2020 | UNIPETROL RPA, s.r.o. |
| EP | Steam separator FA-134 | 2019 | 2020 | UNIPETROL RPA, s.r.o. |
| EP | Technological steam preheater EA-129 | 2019 | 2020 | UNIPETROL RPA, s.r.o. |
| EP | Apparatus to exchanger 4310-E01/E02 | 2017 | 2017 | Unipetrol RPA pre RAFINÉRIE |
| EPC | Air coolers 2513-A02/1,2 a 2514-A02/1,2,3,4,5 production and repair | 2017 | 2018 | Unipetrol RPA, s.r.o. Litvínov |
| PC | H115 conenser bundle renovation | 2017 | 2017 | SPOLANA a.s. |
| EP | TA2018 Apparatuses for 3,4,6,7 units | 2017 | 2018 | Unipetrol RPA pre RAFINÉRIE |
| EPC | New connecting pipeline and technology for spent fuel storage pool filling and reactor shaft filling No.1 | 2015 | 2017 | Slovenské elektrárne, a.s. JE EBO V2 |
| A | Operational safety system - Main Isolation Quick Acting valves (MSIV) - Assessment of service life and functionality of quick acting valves | 2015 | 2015 | ČEZ, a.s. JE Dukovany |
| EOC | Upgrade and safety enhancement of MSIVs DN450 and DN 500, R&D and fabrication of new quick acting actuators | 2016 | 2023 | ČEZ, a.s. JE Dukovany |
| EPC | Severe Accident management - Emergency source of coolant - New connecting pipeline 8JNR10 | 2016 | 2019 | Slovenské elektrárne, a.s. JE MO34 |
| EPC | 6781-New pumps 1-2TB20,40,60D01 | 2017 | 2022 | ČEZ, a.s. JE Dukovany |
| PC | PNR 0116 - Small mechanical projects | 2017 | 2018 | Slovenské elektrárne, a.s., JE EBO V2 |
| EPC | Replacement of essential mechanical pipeline components - stage 2 | 2015 | 2018 | Slovenské elektrárne, a.s., JE EBO V2 |
| EPC | New boron concentration meters | 2017 | 2018 | Slovenské elektrárne, a.s., JE EBO V2 |
| EPC | Modification of coolers of shower systems | 2017 | ongoing | Slovenské elektrárne, a.s., JE EBO V2 |
| PC | Delivery, replacement and overhaul of gland expansion joints within heat transfer pipeline from NPP Bohunice to district heating of city Hlovohovec | 2018 | 2022 | Slovenské elektrárne, a.s., JE EBO V2 |
| EP | New heat exchangers E501B, E502B | 2017 | 2019 | UNIPETROL RPA, s.r.o. |
| EP | C5 EA711 remnant heater | 2018 | 2018 | UNIPETROL RPA, s.r.o. |
| EP | Production of 1piece of tube bundle 2511-E03 | 2018 | 2018 | UNIPETROL RPA, s.r.o. |
| EP | AVD6 – C3 column replacement | 2018 | 2019 | SLOVNAFT, a.s. |
| EPC | Replacement of exchanger EA - 710 | 2016 | 2016 | Unipetrol RPA, s.r.o. Litvínov |
| EP | Nitrous gas coolers tube bundle E5281 | 2016 | 2016 | Lovochemie, a.s. Lovosice |
| EP | 2411-H02/2,3 Generator HHP-GEN 2 pcs | 2016 | 2016 | Česká Rafinérska a.s. |
| EP | New tube bundle 2320-E20 production | 2016 | 2016 | Česká Rafinérska a.s. |
| EP | New tube bundle 1393-E10 production | 2016 | 2016 | Česká Rafinérska a.s. |
| EP | New tube bundle 1392-E19 production- 2 pieces | 2016 | 2016 | Česká Rafinérska a.s. |
| EPC | Electric valves exchange at the ammonia production plant | 2016 | 2017 | Unipetrol RPA, s.r.o. Litvínov |
| EPC | Valves exchange on S 101-C and MC151 turbo circulators at the ammonia production plant | 2016 | 2017 | Unipetrol RPA, s.r.o. Litvínov |
| EPC | Valves exchange on S 101-A,B turbo circulators at the ammonia production plant | 2016 | 2017 | Unipetrol RPA, s.r.o. Litvínov |
| EPC | E3.4 a exchanger refurbishment | 2017 | 2018 | SPOLANA a.s. |
| EP | Air cooler 2301-W17/1 | 2017 | 2017 | Unipetrol RPA, s.r.o. Litvínov |
| EP | 2421-W01 exchanger tube bundle | 2017 | 2017 | Unipetrol RPA pre RAFINÉRIE |
| EP | 2418-E02 tube bundle | 2017 | 2017 | Unipetrol RPA pre RAFINÉRIE |
| E | Hydraulic control of idle gate Sučany | 2014 | 2016 | Slovenské elektrárne, a.s. |
| OC | Disassembly, assembly, repairs and revisions of valves and MSA compensators | 2011 | 2012 | _ |
| EP | Tube bundle for VJ EJ 2 | 2007 | 2007 | SLOVNAFT, a.s. |
| EP | Tube bundle for VJ reforming 5 | 2007 | 2007 | SLOVNAFT, a.s. |
| EP | Air exchanger from ribbed tubes | 2008 | 2009 | SLOVNAFT, a.s. |
| EP | Process effluent valves / Ethylene furnaces | 2008 | 2009 | SLOVNAFT, a.s. |
| EP | Tube exchanger V551 for VJ CCR5 | 2008 | 2008 | SLOVNAFT, a.s. |
| EC | Reconstruction of ethylene units part PSA - OSBL | 2013 | 2015 | SLOVNAFT, a.s. |
| EPC | Exchange of selected electrical valves in PS 100-ČP-TA 2016 | 2015 | 2016 | UNIPETROL RPA, s.r.o. |
| EPC | Fully automatic mechanical filtration station for cooling circuits of PPC 80 MWe, Levice | 2006 | 2007 | Slovintegra energy, s.r.o. |
| EPC | High-pressure station including accessories, pre-filters and provisionals | 2006 | 2007 | Slovintegra energy, s.r.o. |
| EPC | Performance of complete outsourcing of mechanical maintenance of PPC 80 MWe Levice including design changes management in mechanical part | 2007 | 2010 | Slovintegra energy, s.r.o. |
| P | Boiler closures, boiler 180 t/h | 2007 | 2008 | Petrobras |
| C | Steam-gas equipment/ Boiler | 2007 | 2008 | Cementáreň Mordovia, RF |
| EP | Control/ turbine hall, boiler | 2008 | 2009 | BELFAST, UK |
| EP | High-pressure and low-pressure bypass station including accessories, pre-filters and provisionals | 2008 | 2009 | ETI ALUMINYUM, Turecko |
| C | Extension of cooling system of air condensation in turbine of 20 MWe by a new section for PPC 80 MWe Levice - including installation of compensators DN1200 and DN2100 | 2008 | 2008 | Slovintegra energy, s.r.o. |
| C | Production of interconnecting pipelines | 2008 | 2008 | IEG Group, SR |
| EP | Main boiler shut-off valve / boiler | 2009 | 2009 | PPC Energy, s.r.o. |
| EP | High-pressure bypass station including accessories, pre-filters and provisionals | 2009 | 2009 | Eren Erenji Elektrik Uretim, Turecko |
| EP | Main boiler shut-off valve / boiler | 2009 | 2009 | PPC Energy, s.r.o. |
| EP | Control/ turbine hall, boiler | 2010 | 2012 | ČEZ, a.s., PPC POČERADY, CZ 880MW |
| PC | Mechanical part of SCP 58 MWe, production and installation of air channels of combustion turbine | 2010 | 2010 | PPC Energy, s.r.o. |
| EP | Implementation of mechanical-technological part - combustion turbine and distributions for ŠZ 58 MWe Prostějov | 2011 | 2012 | Gama Investment, s.r.o. |
| P | HRSC boiler | 2012 | 2012 | Bacau, Rumunsko |
| EP | Control, reduction stations / turbine hall, boiler | 2008 | 2009 | Colbún S.A., Chile |
| EP | Control, reduction stations / turbine hall, boiler | 2008 | 2009 | TIRME |
| EP | Reduction stations / turbine hall | 2008 | 2009 | SE a.s., SR |
| P | Boiler shut-off valves, boiler 1215 t/h | 2008 | 2008 | Endesa, s.a., Čile |
| PC | Heat removal in steam 40T/hour from ENO3,4 to ENOA, complex project of RCHS with power steam lines of class 15 | 2009 | 2010 | Slovenské elektrárne, a.s., ENO |
| P | Preheater | 2009 | 2009 | Slovenské elektrárne, a.s., EVO |
| PC | Delivery, installation and tests of components of coaling for 2x25 MW, Lac Thinh, Vietnam | 2009 | 2011 | BTG Slovensko |
| EP | Delivery of flue-gas ducting flap valves | 2010 | 2010 | Slovenské elektrárne, a.s., ENO |
| EP | Control, reduction stations / turbine hall, boiler | 2012 | 2012 | EKIBASTUZ |
| EP | Control, reduction stations / turbine hall, boiler | 2012 | 2012 | SVIADNOV |
| EP | Control, reduction stations / turbine hall, boiler | 2012 | 2012 | ELEKTRÁRNA DOMORADICE |
| PC | Delivery, exchange and repair of plug components of thermal feeder of EBO - Hlohovec | 2013 | 2017 | Slovenské elektrárne, a.s., JE EBO V2 |
| C | Modernisation of condenser ENO B Unit 1 | 2013 | 2013 | Slovenské elektrárne, a.s., ENO |
| E | Supports detail design documentation | 2011 | 2013 | Slovenské elektrárne, a.s., JE MO34 |
| E | Proof documentation for systems JEF,KBF, KTA, KBA,QJ | 2011 | 2012 | Slovenské elektrárne, a.s., JE EMO12 |
| E | Pumps and boron meters for radioactive waste treatment | 2011 | 2013 | Slovenské elektrárne, a.s., JE EMO12 |
| EC | Operational safety system - Main steam isolation quick-acting valves (MSIVs) - Edward Valves | 2012 | 2013 | Slovenské elektrárne, a.s., JE EBO V2 |
| EC | Replacement of 27 600 pieces of main condenser tubes | 2012 | 2012 | Slovenské elektrárne, a.s., JE EBO V2 |
| EP | Oil / water heat exchangers for oil cooling circuit of the EDGS | 2012 | 2012 | Slovenské elektrárne, a.s., JE EBO V2 |
| EC | Flow meters for emergency source of coolant | 2012 | 2013 | Slovenské elektrárne, a.s., JE EBO V2 |
| E | Control slide valves A09, A10 type (3 off) | 2012 | 2012 | Slovenské elektrárne, a.s., JE MO34 |
| E | Control slide valves A09 type (3 off) | 2012 | 2012 | Slovenské elektrárne, a.s., JE MO34 |
| E | Belows valves A11 (4 off) | 2012 | 2012 | Slovenské elektrárne, a.s., JE MO34 |
| E | Belows valves A11 (3 off) | 2012 | 2012 | Slovenské elektrárne, a.s., JE MO34 |
| EC | Upgrade of the safety valve system PC 50 type of the steam generator (system of safety valves and control cabinets) | 2013 | 2017 | Slovenské elektrárne, a.s., JE EBO V2 |
| EP | Manufacture of 1 piece of tubular heat exchanger | 2013 | 2013 | ČEZ, a.s., JE Temelín |
| EP | Check valves for essential water circuit | 2013 | 2016 | Slovenské elektrárne, a.s., JE EMO12 |
| E | Severe Accident management - Depressurisation of primary circuit - Elaboration of proof documentation of strength, seismic resistance and lifetime of pipelines and steel structures | 2013 | 2014 | Slovenské elektrárne, a.s., JE EMO12 |
| EP | Quick-acting hermetic closures for project- Separation of I&C room of 4KLA71 system (14 off) | 2013 | 2014 | Slovenské elektrárne, a.s., JE MO34 |
| E | Shutter WAL-A9 DN500 Cl150 for reactor hall HVAC | 2013 | 2013 | ČEZ, a.s., JE Dukovany |
| EPC | Replacement of fittings - cathexis filter bypass | 2014 | 2016 | Slovenské elektrárne, a.s., JE EBO V2 |
| EPC | Operational safety system - IPR EBO 10196 – Modification: Upgrade of the hydrogen reduction station, including generational replacement of equipment, in object 644 SE, EBO V-2 | 2014 | 2016 | Slovenské elektrárne, a.s., JE EBO V2 |
| EPC | Replacement of heat exchangers 1&2 RY30W01 - SG blowdown/ Turbine condensate | 2014 | 2015 | Slovenské elektrárne, a.s., JE EBO V2 |
| E | Operational safety system – Upgrade of the reactor confinement spray system - Proof documentation of safety related valves (DN100, DN300, DN400 PN40) | 2014 | 2014 | Metsamor , ARMENIA |
| P | Controls | 2005 | 2006 | Panevezio Energia |
| C | Assembly & disassembly of main condenser modules of TG42 and TG32 | 2007 | 2007 | Slovenské elektrárne, a.s., JE EBO V2 |
| EC | Replacement of fire-safety closures for JAVYS-A1 | 2008 | 2009 | JAVYS, a.s. |
| P | Fabrication and completion of the TG (Skoda-Doosan K220-44) cooling skid | 2008 | 2008 | Slovenské elektrárne, a.s., JE EBO V2 |
| OC | Emergency flaps of barbotage system | 2009 | 2009 | Slovenské elektrárne, a.s., JE MO34 |
| OC | Repairs, maintenance and inspection of turbines and rotating equipment (including TG Skoda Doosan K220-44) | 2009 | 2010 | Slovenské elektrárne, a.s., JE EBO V2 & JE EMO12 |
| EP | Quick-acting valves for essential service water cooling circuits | 2009 | 2010 | Slovenské elektrárne, a.s., JE MO34 |
| EP | Severe accidents management -main machinery technological equipment for flooding the reactor shaft performing active task during severe accidents | 2009 | 2012 | Slovenské elektrárne, a.s., JE EBO V2 |
| C | Works on mechanical systems of primary circuit and secondary circuit - maintenance, repairs and inspections of valves including other works executed on mechanical part of safety systems- MSIVs, MSSVs. Volume compensation | 2009 | 2012 | Slovenské elektrárne, a.s., JE EBO V2 & JE EMO12 |
| C | High pressure and low pressure heater, desuperheaters | 2009 | 2010 | Slovenské elektrárne, a.s., JE EBO V2 |
| EP | Contaiment boundary isolation valves | 2010 | 2012 | Slovenské elektrárne, a.s., JE MO34 |
| EP | Severe Accident management - Main mechanical part of vacuum breaker system, consisting of special closures with 100% tightness (steel/steel) securing integrity of the containment in stand by mode and provide active function of vacuum breaker during severe accident | 2010 | 2011 | Slovenské elektrárne, a.s., JE EBO V2 |
| EP | General overhaul of existing valves and provision of manufacture of new qualified and unqualified actuators including executing of complete new re-qualification safety and seismic requalification of assembled sets (valve + actuator) | 2010 | 2014 | Slovenské elektrárne, a.s., JE MO34 |
| EP | Oil and water stainless steel piping pre-fabrication and installation | 2010 | 2010 | Slovenské elektrárne, a.s., JE MO34 |
| EOC | General overhaul of gas tight closures, safety class II,III,IV, N and replacement of actuators Inside and Outside containment | 2010 | 2011 | Slovenské elektrárne, a.s., JE MO34 |
| PC | New steam reducing station 4,5/0,7MPa (4 off) | 2011 | 2012 | Slovenské elektrárne, a.s., JE EMO12 |
| EOC | Operational safety system - By-pass station to atmosphere (PSA) - 1 lot delivery | 2011 | 2012 | ČEZ, a.s., JE Dukovany |
| EOC | Operational safety system - By-pass station to atmosphere (PSA) - 2 lot | 2011 | 2012 | ČEZ, a.s., JE Dukovany |
| EP | Severe Accident management - Main mechanical part of Primary circuit depressurisation system consisting of closures retaining full boundary of primary circuit in stand-by mode, ready to provide active function of depressurisation during the severe accident | 2011 | 2012 | Slovenské elektrárne, a.s., JE EBO V2 |
| C | Emergency Core Cooling System, DPS 3.14.01 – rooms A001/1, A002/1, A003/1 | 2011 | 2014 | Slovenské elektrárne, a.s., JE MO34 |
| E | Piping detail design documentation & spooling | 2011 | 2013 | Slovenské elektrárne, a.s., JE MO34 |